Maximizing ROI with High‑Efficiency HVAC Retrofits for Industrial Facilities

Industrial facilities in Montreal and across Canada face rising energy costs, aging equipment, and stricter emissions targets. Upgrading your existing HVAC assets with high‑efficiency chillers, rooftop units, and heat‑recovery systems can deliver 20–40% energy savings—and often pays for itself in just 3–5 years. In this guide, we’ll cover:

  1. Retrofit opportunities & technologies
  2. ROI drivers & payback timelines
  3. Step‑by‑step plan to maximise ROI
  4. Local case study: manufacturing plant
  5. Next steps

RETROFIT OPPORTUNITIES & TECHNOLOGIES

a. High‑Efficiency Rooftop Units (RTUs)
– Upgrade gain: modern RTUs achieve 12–15 EER vs. 8–10 in legacy models
– Energy saving: ~25% reduction in cooling electricity
– Ideal for warehouses, manufacturing floors, distribution centers

b. Variable‑Refrigerant‑Flow (VRF) Systems
– Zoning benefits: independently control temperature in 10+ zones
– Efficiency gain: up to 30–40% lower energy use via inverter compressors
– Ideal for office towers, R&D labs, clean‑room environments

c. Heat‑Recovery Chillers
– Dual use: capture waste heat from process cooling to pre‑heat space or domestic hot water
– Efficiency gain: up to 35% total facility energy reduction
– Ideal for food processing, pharmaceuticals, chemical plants


ROI DRIVERS & PAYBACK TIMELINE

Retrofit Measure Incremental Cost Annual Savings* Estimated Payback
RTU Replacement $250,000 $50,000 (25%) 5 years
VRF System Installation $400,000 $120,000 (30%) 3.3 years
Heat‑Recovery Chiller Retrofit $600,000 $210,000 (35%) 2.9 years
BAS & Controls Integration $150,000 $22,500 (15%) 6.7 years

*Savings based on a typical industrial facility.
Key factors affecting ROI: baseline equipment age, local utility rates, available incentives (see ÉcoPerformance grants for up to 75% funding), and maintenance strategy.


STEP‑BY‑STEP GUIDE TO MAXIMIZE ROI

a. Commissioning & Energy Audit
-Conduct an RCx study to identify performance drift
-Benchmark current energy use, peak loads, runtime

b. Develop a Phased Retrofit Plan
-Phase 1: low‑cost, high‑return measures (controls, VFDs, economizers)
-Phase 2: major equipment swaps (RTUs, chillers, VRF)
-Phase 3: heat‑recovery and renewable integrations

c. Leverage Government Incentives
-Apply for Québec’s ÉcoPerformance Standard stream (75% of retrofit costs)

d. Select the Right Equipment & Installer
-Choose OEMs with proven reliability and local support
-Partner with a full‑service provider (like LES Mécanique) to bundle mechanical, electrical, and everything in between

e. Implement & Monitor
-Track kWh consumption, peak‑demand charges, zone comfort levels
-Fine‑tune BAS schedules and setpoints to ensure projected savings are realized


LOCAL CASE STUDY: MANUFACTURING PLANT

Scope: Replaced five 10‑ton RTUs with 15 EER models; added BAS and economizer controls
Results:
• 28% reduction in cooling energy (1,200 MWh → 864 MWh/yr)
• Annual savings of $72,000
• Payback period: 3.5 years


CONCLUSION & NEXT STEPS

Investing in high‑efficiency industrial HVAC retrofits is one of the most effective ways to reduce operating costs, meet emissions targets, and extend asset life. By focusing on proven technologies—RTUs, VRF, heat‑recovery chillers, and smart controls—you can achieve payback in under 6 years and significant long‑term savings.

Ready to maximize your ROI on commercial HVAC solutions in Montréal?
Contact Les Mécanique today to schedule your comprehensive energy audit and retrofit plan:
• Call (514) 333-6968
• Request a free consultation

Back to blog